欧美va亚洲va日韩∨a综合色,在线综合视频,超碰97久久,国产成人亚洲欧洲在线,91在线91拍拍在线91,日韩欧美高清一区二区,久草免费在线

 
Chinese firm completes beam closure along China-Laos railway
                 Source: Xinhua | 2019-01-20 09:15:42 | Editor: huaxia

The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

Back to Top Close
Xinhuanet

Chinese firm completes beam closure along China-Laos railway

Source: Xinhua 2019-01-20 09:15:42

The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

010020070750000000000000011100001377588261